20.11.2020
From Tuesday, 24.11. to Friday, 18.12.2020, Sudfeldstraße will be fully closed again at the level of the Sudfeld Bridge construction site. Reasons include the dismantling of the temporary bridge Sudfeldstraße, various demolition and dismantling works, dismantling of the old Sudfeldstraße West bridge and explosive ordnance drillings for beam drill shoring parallel to Sudfeldstraße.
Sudfeldstraße will be opened during the Christmas holidays. After that, a half-sided traffic routing will be established.